Thread: Dora 1/35
View Single Post
  #119  
Old 10-27-2018, 06:57 AM
Fledermaus's Avatar
Fledermaus Fledermaus is offline
Senior Member
 
Join Date: May 2007
Location: Puerto Rico
Posts: 432
The motor pulleys are constructed using 3 flat washers, 12.8mm x 5.6mm inside
A piece of 5.5mm x 13mm styrene tube and a piece of 4mm x 70mm long tube
This will be cut to the correct size when the pulleys are glued in place




The 3 washers are glued to the 5.6mm tube equally spaced




This is how it will be when the tube is passed through the motor


The tube with the washers goes in and the 4mm tube is pushed into the motor and through the washer’s tube


It should look like this


Side view


The motor and motor base ready to install




The cables will be installed when all the parts and the elevators are in place

Hope you like it more work coming soon

Thanks
Abdin
__________________
"Don't be afraid of the model,it's you the one holding the knife"
Reply With Quote top
Users like Fledermaus's post!